Client : Murphy Sarawak Oil Company Limited
Award Date : 6th January 2011
Completed Date (MCD): March 2012 (onshore) June 2013 ( offshore)
Project Title :
Engineering, Procurement, Construction, Installation and Commissioning of Merapuh-A Production Topside for SK309/311 Phase II Sarawak Gas Development Project.
The MEPA Production Platform Topsides is comprised of main deck, mezzanine deck, cellar deck and a sub-cellar deck which house the coolers, pedestal crane, generators, refrigerant chiller package, production and condensate flash separators and chemical injection packages. The facilities also include wellheads, vessels, process and utility equipment and systems, pumps, electrical and instrument equipment and systems, E&I room and the like.