Projects

FABRICATION OF SJQ-A TOPSIDES

FABRICATION OF SJQ-A TOPSIDES
CLIENT : SABAH SHELL PETROLEUM COMPANY LIMITED
CONTACT NO : 600501
AWARD DATE : 15 MAY 2009

The SJQ-A Topside scope covers the engineering, procurement, fabrication, inspection, testing and onshore commissioning, weighing, loadout and seafastening. The SJQ-A Topside is a 3-Deck steel structure standing on the 4-legged jacket. The topsides designed to be installed as a single lift with an estimated weight of 2100 MT.