The first EPC Project undertaken by Brooke Dockyard
Client : Talisman Malaysia Co. Ltd
Award Date : 7th August 2001
Completed Date : 5th March 2003 & 10th March 2003
Tonnage: 3,100 MT (for both platforms )
The first 4 modules / substructure that Brooke under took for Talisman Malaysia Limited ( a Subsidiary of Talisman Energy Group of Canada ). The full load out operations for both the BR-C and BK-C Modules / Substructure will take place within a 7 days time frame.
This particular contract was awarded to Brooke Dockyard as an EPCC Contract, the first ever EPCC undertaken by Brooke in its oil & gas ventures. The duration of the project from design to complete onshore commissioning is 20 months and this was completed within the schedule stipulated.
BK-C & BR-C are both 18 slots drilling platforms with total fabricated weight of around 3,000 tonne including piles and conductors. These platforms will be installed later offshore at the Malaysian – Vietnam waters as part of a Malaysian- Vietnam joint effort to develop offshore oil & gas resources.
Another notable milestone for the 90 over year old corporation has been its remarkable safety reward with a achievement of 820,000 man hours without any lost time incident ( LTI).
We are thankful to the Talisman Malaysia Limited and Petronas for the confidence in awarding us the project particularly the opportunity given to undertake the first design & construction contract for the offshore oil & gas industry.
The award of the contract to Brooke also reflects our relentless capacity to be competitive for these works are not only bidded out to a few Malaysian fabrication yards but also to some established yards in Vietnam.